After sketing it out on paper, I roll a slab big enough for the bottom. I then roll lots of slabs for the sides which are about 3" x 15" and attach them to the base building vertically. With scratch and slip, I build then next layer. Usually, I can only do two layers or the weight of the soft clay will begin collapsing. So, I let it dry covered for at least a day.